Finance Committee Agenda
21 July 2021
![]() |
ALL INFORMATION AVAILABLE IN VARIOUS FORMATS ON REQUEST
MEETING NOTICE AND AGENDA – 21 July 2021
TO: THE MAYOR AND COUNCILLORS
NOTICE is given that a meeting of the Finance Committee will be held in the Committee Room, Administration Building, Southern Drive, Busselton on Wednesday, 21 July 2021, commencing at 10.00am.
The attendance of Committee Members is respectfully requested.
DISCLAIMER
Statements or decisions made at Committee meetings should not be relied on (or acted upon) by an applicant or any other person or entity until subsequent written notification has been given by or received from the City of Busselton. Without derogating from the generality of the above, approval of planning applications and building permits and acceptance of tenders and quotations will only become effective once written notice to that effect has been given to relevant parties. The City of Busselton expressly disclaims any liability for any loss arising from any person or body relying on any statement or decision made during a Committee meeting.
Mike Archer
CHIEF EXECUTIVE OFFICER |
|
14 July 2021
CITY OF BUSSELTON
Agenda FOR THE Finance Committee MEETING TO BE HELD ON 21 July 2021
TABLE OF CONTENTS
ITEM NO. SUBJECT PAGE NO.
1....... Declaration of Opening, ACKNOWLEDGEMENT OF COUNTRY and Announcement of Visitors
4....... Disclosure Of Interests
5....... Confirmation Of Minutes
5.1 Minutes of the Finance Committee Meeting held 9 June 2021
6.1 LIST OF PAYMENTS MADE - MAY 2021
6.2 FINANCIAL ACTIVITY STATEMENTS - YEAR TO DATE AS AT 31 MAY 2021
6.3 APPLICATION FOR RATE EXEMPTION - GROUP TRAINING SOUTH WEST INC.
7....... General Discussion Items
Finance Committee 4 21 July 2021
1. Declaration of Opening, ACKNOWLEDGEMENT OF COUNTRY and Announcement of Visitors
5. Confirmation Of Minutes
5.1 Minutes of the Finance Committee Meeting held 9 June 2021
That the Minutes of the Finance Committee Meeting held 9 June 2021 be confirmed as a true and correct record. |
Finance Committee 6 21 July 2021
6.1 LIST OF PAYMENTS MADE - MAY 2021
LEADERSHIP - A Council that connects with the community and is accountable in its decision making. |
|
STRATEGIC PRIORITY |
4.2 Deliver governance systems that facilitate open, ethical and transparent decision making. |
SUBJECT INDEX |
Financial Operations |
BUSINESS UNIT |
Financial Services |
REPORTING OFFICER |
Manager Financial Services - Paul Sheridan |
AUTHORISING OFFICER |
Manager Governance and Corporate Services - Sarah Pierson |
NATURE OF DECISION |
Noting: The item is simply for information purposes and noting |
VOTING REQUIREMENT |
Simple Majority |
ATTACHMENTS |
Attachment a List
of Payments May 2021⇩ |
That the Council notes payment of voucher numbers M118788 – M118825, EF079166 – EF079828, T7559 – T7562, DD004475 – DD004508, as well as payroll payments, together totalling $6,935,157.99. |
EXECUTIVE SUMMARY
This report provides details of payments made from the City’s bank accounts for the month of May 2021, for noting by the Council and recording in the Council Minutes.
BACKGROUND
The Local Government (Financial Management) Regulations 1996 (the Regulations) requires that, when the Council has delegated authority to the Chief Executive Officer to make payments from the City’s bank accounts, a list of payments made is prepared each month for presentation to, and noting by, the Council.
OFFICER COMMENT
In accordance with regular custom, the list of payments made for the month of May 2021 is presented for information.
Statutory Environment
Section 6.10 of the Local Government Act 1995 and more specifically Regulation 13 of the Regulations refer to the requirement for a listing of payments made each month to be presented to the Council.
Relevant Plans and Policies
There are no relevant plans or policies to consider in relation to this matter.
Financial Implications
There are no financial implications associated with the officer recommendation.
Stakeholder Consultation
No external stakeholder consultation was required or undertaken in relation to this matter.
Risk Assessment
An assessment of the potential implications of implementing the officer recommendation has been undertaken using the City’s risk management framework, with risks assessed taking into account any controls already in place. No risks of a medium or greater level have been identified.
Options
Not applicable.
CONCLUSION
The list of payments made for the month of May 2021 is presented for information.
TIMELINE FOR IMPLEMENTATION OF OFFICER RECOMMENDATION
Finance Committee 21 21 July 2021
6.2 FINANCIAL ACTIVITY STATEMENTS - YEAR TO DATE AS AT 31 MAY 2021
LEADERSHIP - A Council that connects with the community and is accountable in its decision making. |
|
STRATEGIC PRIORITY |
4.2 Deliver governance systems that facilitate open, ethical and transparent decision making. |
SUBJECT INDEX |
Financial Services |
BUSINESS UNIT |
Financial Services |
REPORTING OFFICER |
Manager Financial Services - Paul Sheridan |
AUTHORISING OFFICER |
Manager Governance and Corporate Services - Sarah Pierson |
NATURE OF DECISION |
Executive: Substantial direction setting, including adopting budgets, strategies, plans and policies (excluding local planning policies); funding, donations and sponsorships; reviewing committee recommendations |
VOTING REQUIREMENT |
Simple Majority |
ATTACHMENTS |
Attachment a Financial Activity
Statement - May 2021⇩ Attachment b Investment
Report - May 2021⇩ |
That the Council receives the statutory financial activity statement reports for the period ending 31 May 2021, pursuant to Regulation 34(4) of the Local Government (Financial Management) Regulations. |
EXECUTIVE SUMMARY
Pursuant to Section 6.4 of the Local Government Act 1995 (the Act) and Regulation 34(4) of the Local Government (Financial Management) Regulations 1996 (the Regulations), a local government is to prepare, on a monthly basis, a statement of financial activity that reports on the City’s financial performance in relation to its adopted / amended budget.
This report has been compiled to fulfil the statutory reporting requirements of the Act and associated Regulations, whilst also providing the Council with an overview of the City’s financial performance on a year to date basis, for the period ending 31 May 2021.
BACKGROUND
The Regulations detail the form and manner in which financial activity statements are to be presented to the Council on a monthly basis, and are to include the following:
· Annual budget estimates
· Budget estimates to the end of the month in which the statement relates
· Actual amounts of revenue and expenditure to the end of the month in which the statement relates
· Material variances between budget estimates and actual revenue/expenditure (including an explanation of any material variances)
· The net current assets at the end of the month to which the statement relates (including an explanation of the composition of the net current position)
Additionally, and pursuant to Regulation 34(5) of the Regulations, a local government is required to adopt a material variance reporting threshold in each financial year. At its meeting on 27 July 2020, the Council adopted (C2007/071) the following material variance reporting threshold for the 2020/21 financial year:
That pursuant to Regulation 34(5) of the Local Government (Financial Management) Regulations, the Council adopts a material variance reporting threshold with respect to financial activity statement reporting for the 2020/21 financial year as follows:
· Variances equal to or greater than 10% of the year to date budget amount as detailed in the Income Statement by Nature and Type/Statement of Financial Activity report, however variances due to timing differences and/or seasonal adjustments are to be reported only if not to do so would present an incomplete picture of the financial performance for a particular period; and
· Reporting of variances only applies for amounts greater than $25,000.
OFFICER COMMENT
In order to fulfil statutory reporting requirements and to provide the Council with a synopsis of the City’s overall financial performance on a year to date basis, the following financial reports are attached hereto:
Statement of Financial Activity
This report provides details of the City’s operating revenues and expenditures on a year to date basis, by nature and type (i.e. description). The report has been further extrapolated to include details of non-cash adjustments and capital revenues and expenditures, to identify the City’s net current position; which reconciles with that reflected in the associated Net Current Position report.
Net Current Position
This report provides details of the composition of the net current asset position on a full year basis, and reconciles with the net current position as per the Statement of Financial Activity.
Capital Acquisition Report
This report provides full year budget performance (by line item) in respect of the following capital expenditure activities:
· Land and Buildings
· Plant and Equipment
· Furniture and Equipment
· Infrastructure
Reserve Movements Report
This report provides summary details of transfers to and from reserve funds, and associated interest earnings on reserve funds, on a full year basis.
Additional reports and/or charts can
be provided as required to further supplement the information comprised within
the statutory financial reports.
Comments on Financial Activity to 31 May 2021
The Statement of Financial Activity (FAS) for the year to date (YTD) shows an overall Net Current Position of $4.96M as opposed to the amended budget of ($12.1M). This represents a positive variance of $17.1M YTD. This variance increased by $3.7M from $13.5M at the end of April.
The following table summarises the major YTD variances that appear on the face of the FAS, which, in accordance with Council’s adopted material variance reporting threshold, collectively make up the above difference. Each numbered item in this lead table is explained further in the report.
Description |
2020/21 $ |
2020/21 $ |
2020/21 $ |
2020/21 % |
2020/21 $ |
Change in Variance Current Month $ |
Revenue from Ordinary Activities |
|
3.96% |
2,899,486 |
261,616 |
||
1. Operating Grants, Subsidies and Contributions |
5,584,461 |
4,010,229 |
4,782,445 |
39.26% |
1,574,232 |
142,611 |
2. Other Revenue |
554,249 |
338,275 |
424,730 |
63.85% |
215,974 |
42,175 |
3. Interest Earnings |
839,459 |
994,802 |
1,046,684 |
(15.62%) |
(155,343) |
(43,192) |
Expenses from Ordinary Activities |
|
|
|
|
||
4. Materials & Contracts |
(12,630,973) |
(16,140,363) |
(18,147,582) |
21.74% |
3,509,390 |
204,534 |
5. Other Expenditure |
(2,311,884) |
(3,365,672) |
(5,236,779) |
31.31% |
1,053,788 |
(239,507) |
6. Non-Operating Grants, Subsidies and Contributions |
5,589,060 |
14,220,060 |
34,437,199 |
(60.70%) |
(8,631,000) |
(2,019,063) |
Capital Revenue & (Expenditure) |
|
28.16% |
13,824,293 |
5,335,883 |
||
7. Land & Buildings |
(3,155,107) |
(8,881,049) |
(17,454,059) |
64.47% |
5,725,942 |
1,718,030 |
Plant & Equipment |
(1,234,932) |
(2,473,982) |
(2,510,340) |
50.08% |
1,239,050 |
(9,570) |
Infrastructure |
(17,425,882) |
(32,649,857) |
(40,057,700) |
46.63% |
15,223,975 |
1,889,089 |
8. Proceeds from Sale of Assets |
339,756 |
581,500 |
581,500 |
(41.57%) |
(241,744) |
0 |
9. Proceeds from New Loans |
0 |
7,700,000 |
7,700,000 |
(100.00%) |
(7,700,000) |
0 |
10. Repayment of Capital Lease |
(456,815) |
(521,901) |
(521,900) |
12.47% |
65,086 |
2,825 |
11. Advances to Community Groups |
0 |
(200,000) |
(200,000) |
100.00% |
200,000 |
0 |
12. Transfer to Restricted Assets |
(5,453,037) |
(50,424) |
(62,750) |
(10714.37%) |
(5,402,613) |
(156,433) |
13. Transfer from Restricted Assets |
2,596,074 |
1,556,917 |
2,807,074 |
66.74% |
1,039,157 |
(482,408) |
14. Transfer from Reserves |
9,706,572 |
6,139,756 |
34,901,501 |
58.09% |
3,566,816 |
2,534,180 |
Revenue from Ordinary Activities
In total, revenue from Ordinary Activities is $2.9M, or 3.7%, ahead of budget YTD. The material variance items contributing to this include:
1. Operating Grants, Subsidies and Contributions
Ahead of YTD budget by $1.6M, or 39.3%, mainly due to the items listed in the table below:
Revenue Code |
Revenue Code Description |
Actual YTD $ |
Amended Budget YTD $ |
Variance |
Variance |
Change in Variance Current Month $ |
Finance and Corporate Services |
1,757,409 |
1,709,861 |
47,548 |
2.71% |
662 |
|
10510 |
Governance Support Services – State Government Operating Grants |
- |
18,700 |
(18,700) |
(100.00%) |
(1,700) |
Each year the City takes on a disability trainee. At the time of setting the budget, it is not known where this person may be placed, so the reimbursement from the State Government is budgeted in this area. The trainee was actually placed at the GLC, with all associated actual wage costs and reimbursements allocated to this area. |
||||||
10152 |
Other General Purpose Funding – Financial Assistance Grants |
1,424,119 |
1,394,881 |
29,238 |
2.05% |
7,310 |
Actual grants received are slightly higher than originally budgeted. The Grants Commission always advises the exact amounts to be received well after budget adoption. |
||||||
10151 |
Rates Administration – Reimbursements – Legal Fees |
41,855 |
28,996 |
12,859 |
30.72% |
6,086 |
There has been a much higher than expected requirement for debt recovery services in relation to overdue rates. Legal costs for this process are reimbursed by the ratepayers involved. |
||||||
10200 |
Financial Services – Reimbursements – Insurance |
126,578 |
104,735 |
21,843 |
17.26% |
(6,654) |
The second instalment of the LGIS Contributions Assistance Package was due to be received in November, but instead a credit note received from LGIS was offset against scheme policies that were due for payment in early December, at their instruction. |
||||||
10522 |
Occupational Health & Safety – Reimbursement – Wellness Program |
7,160 |
22,913 |
(15,753) |
(220.01%) |
(203) |
Due to COVID restrictions in the first half of the financial year a number of programs were either not able to proceed or were undersubscribed. With the relaxing of restrictions and returning confidence, staff participation in the various Wellness activities has increased, however it is unlikely that the full budget will be achieved by year end. |
||||||
Community and Commercial Services |
346,588 |
242,319 |
104,269 |
30.08% |
24,031 |
|
10540 |
Recreation Administration – State Government Operating Grants |
31,736 |
18,337 |
13,399 |
42.22% |
(1,667) |
The grant applications that have been approved by the State Government have derived approximately $30K in excess of the total amount budgeted for the year of $20K. |
10541 |
Recreation Planning – State Government Operating Grants |
14,348 |
- |
14,348 |
100.00% |
14,348 |
The Department of Local Government, Sport & Cultural Industries awarded $14K to the City from the Community Sporting and Recreation Facilities fund (CSRFF), to develop the Master Plan for Sir Stewart Bovell Sports Park. |
||||||
B1361 |
YCAB (Youth Precinct Foreshore) – State Government Operating Grants |
30,138 |
13,750 |
16,388 |
54.38% |
- |
Additional unbudgeted Crime Prevention Grant received from WA Police to run the Choices Program. |
||||||
11151 |
Airport Operations – Contributions |
101,000 |
50,000 |
51,000 |
50.50% |
16,000 |
More contributions toward airport marketing have been received from neighbouring local governments than was originally anticipated. |
||||||
10530 |
Events & Cultural Services Administration – Parenting Leave Reimbursements |
14,655 |
- |
14,655 |
100.00% |
- |
Parenting leave reimbursement was not planned at the time of the development of the 20/21 budget. |
||||||
10630 |
Economic and Business Development Administration – Parenting Leave Reimbursements |
9,059 |
- |
9,059 |
100.00% |
- |
Parenting leave reimbursement was not planned at the time of the development of the 20/21 budget. |
||||||
Planning and Development Services |
1,029,890 |
1,043,297 |
(13,407) |
(1.30%) |
85,317 |
|
10820 |
Strategic Planning – State Government Grants |
22,500 |
37,500 |
(15,000) |
(66.67%) |
22,500 |
The variation from Strategic Planning budget (Grant $37,500) is due to the total grant ($75,000) being acquitted in three instalments: the first payment was received some time ago on achievement of certain project milestones to that stage in the preparation of the ‘Coastal Adaptation Strategy’ or CHRMAP, ‘Coastal Hazard Risk Management and Adaptation Plan’. The second payment (30%) was received in May 2021 following adoption of the draft CHRMAP for advertising by the Council (OCM 24 February 2021). The final payment of 20% is due once Council adopts the final CHRMAP. Preparation of this complicated and comprehensive document has been set back several times over the past 2 years due to project requirements concerning financial modelling and Government Working Group reviews et al. As such, the City has received approval to extend the anticipated completion date for the project (this has occurred several times) until 31 March 2022. The $15,000 final grant payment will therefore not be paid until FY 21/22. |
||||||
10830 |
Environmental Management Administration – State Government Grants |
18,780 |
- |
18,780 |
100.00% |
- |
Grant received in two lots in September and December, however it was budgeted to be received in June. |
||||||
10925 |
Preventative Services – CLAG – State Government Grants |
32,038 |
44,370 |
(12,332) |
(38.49%) |
- |
The Department of Health contribution to the mosquito program was less than expected. |
||||||
Engineering and Works Services |
2,450,574 |
1,014,752 |
1,435,822 |
58.59% |
32,601 |
|
S0076 |
Kaloorup Road (Stage 1) – Main Roads Operating Grant |
- |
267,000 |
(267,000) |
(100.00%) |
- |
Works originally budgeted to be completed by April are forecast to be complete in June, however grant acquittal and invoicing cannot be finalised until all billing has been processed and a final reconciliation of works has been completed and signed off. |
||||||
11160 |
Busselton Jetty – Contributions |
842,772 |
429,700 |
413,072 |
(100.00%) |
- |
The second half yearly contribution was budgeted to be received in June, however it was received in April. |
||||||
11162 |
Busselton Jetty - Underwater Observatory – Reimbursement of Utilities Charges |
24,243 |
- |
24,243 |
100.00% |
13,770 |
The City recoups both electricity and sewer service charges from Busselton Jetty Inc. Due to an administrative oversight, this item has not been budgeted, however there is a nil impact on the municipal net current position due to this income being put into the Jetty reserve. This offsets the costs which are also put into the reserve. YTD also contains an insurance re-imbursement of $14K for damage to the UPS during storm events in May 2020. |
||||||
11300 |
Sanitation Waste Services Administration – Parenting Leave Reimbursements |
13,570 |
- |
13,570 |
100.00% |
- |
Parenting leave reimbursement was not planned at the time of the development of the 20/21 budget. |
||||||
11301 |
Regional Waste Management Administration – Reimbursements |
95,919 |
20,163 |
75,756 |
78.98% |
(1,833) |
The contributions to the 2020/21 Southwest Regional Waste Group Project were received from 10 participating local governments in November and April, totalling $48K each time. Only $22K was budgeted for the year, and this was spread over 12 months. |
||||||
11501 |
Operations Services Works – Insurance Reimbursements |
253,706 |
56,100 |
197,606 |
77.89% |
23,598 |
Workers compensation claims totalling $254K have been received YTD. This is by nature very difficult to predict. $61K was budgeted for the year, spread evenly over 12 months. |
||||||
B1401 & B9610 |
Old Butter Factory – Insurance Reimbursements |
149,415 |
- |
149,415 |
100.00% |
- |
Conservation and fire damage works now completed. Insurance claim has now been approved and paid. Not budgeted as additional works were required for structural and fire compliance that had not been scoped at commencement of the works. Not unusual for conservation projects of this nature. Net impact after insurance claims is estimated at approximately ($30K). |
||||||
M9999 |
Road Maintenance Bal Of Budget – Insurance Reimbursements |
778,013 |
- |
778,013 |
100.00% |
- |
Storm damage claims from the storm events in May 2020. |
2. Other Revenue
Ahead of YTD budget by $216K, or 63.8%, mainly due to the items listed in the table below:
Revenue Code |
Revenue Code Description |
Actual YTD $ |
Amended Budget YTD $ |
Variance |
Variance |
Change in Variance Current Month $ |
Finance and Corporate Services |
57,422 |
31,337 |
26,085 |
83.24% |
12,489 |
|
10200 |
Financial Services – Sundry Income |
21,971 |
198 |
21,773 |
10,996% |
12,385 |
Due to workload issues and a change in staff in Planning, there was a delay in on-payment of development application fees to the Department of Planning for fees received from an applicants in April and May. This will be rectified in June. |
||||||
Community and Commercial Services |
48,813 |
5,885 |
42,928 |
729.44% |
8,135 |
|
10591 |
Geographe Leisure Centre – LSL Contributions from other LG’s |
18,132 |
- |
18,132 |
100.00% |
- |
Long Service Leave entitlements accrued can be transferred between local governments. This receipt was budgeted for in June, however it was received earlier than expected. |
||||||
10625 |
Art Geo Administration – Sale of Artworks |
6,588 |
- |
6,588 |
100.00% |
(740) |
The distribution of the proceeds of artwork sales on behalf of the artists is done in the month following the sales after the monthly reconciliation process. |
||||||
10630 |
Economic and Business Development Administration – LSL Contributions from other LG’s |
9,738 |
- |
9,738 |
100.00% |
- |
Long Service Leave entitlements accrued can be transferred between local governments. At the time of budgeting, it was not known that the City would be employing a person for whom a LSL entitlement would be transferred. |
||||||
Planning and Development Services |
201,101 |
129,019 |
72,082 |
55.87% |
4,614 |
|
10925 |
Preventative Services – CLAG – Sundry Income |
83,195 |
3,740 |
79,455 |
2124.45% |
5,519 |
Due to the much earlier and more significant onset of the Ross River Virus threat, extra chemical applications were required. Permission was received from the Department of Health to draw extra trust funds for these purposes. |
||||||
10970 |
Parking Control – Parking Fines & Costs |
31,535 |
55,000 |
(23,465) |
(42.66%) |
(3,492) |
Budgeting for this is always done on a simple historical trend basis, and is never a targeted revenue source. It is down on budget due to the enforcement team being temporarily understaffed. |
||||||
Engineering and Works Services |
246,912 |
172,034 |
74,878 |
43.53% |
16,938 |
|
11107 |
Engineering Services Design – LSL Contributions from other LG’s |
14,475 |
- |
14,475 |
100.00% |
- |
Long Service Leave entitlements accrued can be transferred between local governments. At the time of budgeting, it was not known that the City would be employing a person for whom a LSL entitlement would be transferred. |
||||||
G0030 |
Busselton Transfer Station – Sale of Scrap Materials |
143,138 |
88,099 |
55,039 |
62.47% |
18,745 |
The pricing received for scrap metal has been significantly higher than originally forecast. As such, higher than predicted volumes have also been delivered to the recyclers to take advantage of this pricing. |
3. Interest Earnings
Interest earnings is $155K, or 15.6%, behind budget YTD May due to the significantly lower than forecast interest rates, as a result of the COVID pandemic induced economic downturn. The current low interest rate environment will reduce the City’s income in both the current budget period and future years.
Expenses from Ordinary Activities
Expenditure from ordinary activities is $4.5M, or 6.3%, less than expected when compared to the budget YTD as at May. The following individual expense line items on the face of the financial statement have YTD variances that meet the material reporting thresholds:
4. Materials and Contracts
Better than budget by $3.5M, or 21.7%. The table below lists the main items contributing to this variance:
Cost Code |
Cost Code Description |
Actual YTD $ |
Amended Budget YTD $ |
Variance |
Variance |
Change in Variance Current Month $ |
Finance and Corporate Services |
1,773,420 |
2,209,869 |
436,449 |
19.7% |
184,328 |
|
10151 |
Rates Administration |
204,617 |
283,787 |
79,170 |
27.9% |
1,907 |
The variance is predominantly due to the under spend in consultancy. This budget was for the Rating Review Project, funded by reserves. The project has been delayed due to resourcing issues in the Rates team, plus communications with the Minister regarding rates reviews that have changed the scope of the project. Unspent funds will remain carried forward in the reserve to fund the revised project. |
||||||
10200 |
Financial Services |
40,285 |
74,972 |
34,687 |
46.3% |
5,498 |
Due mainly to a reduction in bank fees that were budgeted at a higher amount, plus none of the consultancy budget has been used YTD. This will potentially be used later in the financial year in relation to adoption of new accounting standards, as well as in the Rates area to help fine tune some system functionality in the lead up to the annual rates run. |
||||||
10250 |
Information & Communication Technology Services |
1,051,695 |
1,239,487 |
187,792 |
15.2% |
100,545 |
Outstanding invoices for commitments we have raised are responsible for the increase in variance, a description of the primary variances are below: · Software licenses –The City’s licenses still are on track to go over budget this year with the addition of some unplanned software, we are waiting on invoices for the $159,000 in commitments we have outstanding which will reduce the variance accordingly. · Photocopying – As mentioned in Customer Service below, the printer costs are routing through this account hence the budget overspend. · GIS costs – It was planned to use a new image provider at a reduced cost, unfortunately they could not provide what was agreed upon and the City continued to use Landgate at a higher cost. · Consultancy – We are underspent in consultancy this FY, unplanned projects have affected our ability to resource the projects we had initially targeted for this year. We are waiting on invoices for $37,000 of committed spend which will reduce the variance accordingly. · Contractors (including Contract Staff) – By end of year there will be a $100,000 underspend due to the budgeted contractor being engaged as an employee. This was originally funded from reserve. |
10360 |
Customer Services |
21,278 |
43,196 |
21,918 |
50.7% |
2,093 |
· Photocopying – The Finance team going paperless has had a significant impact on the City’s paper spend, especially for coloured paper. In addition, an arrangement has been made with the Executive Assistants for auditing of the stationery supplies in their departments, so ordering has been more closely aligned to needs rather than maintaining large stores. · Computer Consumables – Historically, printer cartridges etc. came from this bucket. With the adoption of more printers using a full supply contract this account is not being utilised. The City still orders some cartridges manually but the number is heavily reduced. This will be reviewed during the upcoming budget considerations for 21/22 to get a better idea of actual spend. |
||||||
10500 |
Legal & Compliance Services |
113,056 |
136,265 |
23,209 |
17.0% |
81,515 |
Expenditure on various reactive legal matters have not required as much expenditure as originally anticipated. |
||||||
10616, 10617 & 10618 |
Aged Housing |
84,514 |
129,811 |
45,297 |
34.9% |
1,458 |
Lower than expected maintenance costs to the end of the reporting period. Less reactive maintenance for FY to date. |
||||||
Community and Commercial Services |
1,357,176 |
2,000,538 |
643,362 |
32.2% |
(84,115) |
|
10380 |
Busselton Library |
55,269 |
106,102 |
50,833 |
47.9% |
1,618 |
· Non-capital Furniture & Office Equipment – Offsets an overspend in 7743 due to capitalisation of shelving/furniture purchases. (Purchase Order 49449 raised, $6,063 deposit has been paid, with the remaining funds in process of being rolled over into the 2021/22 budget). · Contractors (Inc Contract staff) - $8,000 underspend to offset $8,000 grant income not received (Be Connected Grant). · Entity Specific Consumables – The coffee machine has been disposed of, which means that there will be no expenditure, and no offset income. |
||||||
10381 |
Dunsborough Library |
21,591 |
33,808 |
12,217 |
36.1% |
72 |
· Contractors – Currently chasing up annual carpet cleaning with Facilities who have now assumed responsibility for scheduling annual carpet cleaning. · Other Computer costs - $1,800 networking costs no longer required. · Photocopying – centralised purchases have not been allocated correctly. · Library Resources – expenditure has increased and monies will be spent (annual expenditure patterns were delayed due to RFQ process earlier in the year). |
||||||
10540 |
Recreation Administration |
15,534 |
44,348 |
28,814 |
65.0% |
(1,686) |
The City’s application to the State Government for the 2021 & 2022 Every Club grants was successful. Grant deeds have been received and executed. It is envisaged that $15K of the $30K that has been invoiced will need to be rolled into next FY to fund the new Community and Recreation service trainee and the remaining $15K will be expended on delivering the program through workshops. |
||||||
10541 |
Recreation Planning |
2,930 |
139,750 |
136,820 |
97.9% |
3,087 |
Timing of expenditure was awaiting the outcomes of external grant applications. During February grant deeds were finalised, however the scope of work will not be finalised with the preferred consultant until June. It is estimated that this will absorb approximately $70K of the underspend variance by EOFY. |
10590 |
Naturaliste Community Centre |
48,927 |
85,491 |
36,564 |
42.8% |
777 |
Variance primarily due to line items below: · Photocopying – $2.25K this budget allowance has been offset by IT as an expense within their budget. · Licence Fees - $4.3K underspend, likely to remain at approximately $3.5K by EOFY. · Contractors – $9.3K underspend, pending storage works commencing/completion at NCC in June to expend this area. · Holiday Program – $7.3K underspend, likely to result in $5K underspend due to reduced program this year. · Leisure Program Activities – $1.4K underspend, this will be expended by EOFY. It is anticipated that there will be an overall underspend in these areas by the EOFY. |
||||||
270,288 |
329,130 |
58,842 |
17.9% |
(568) |
||
Variance primarily due to line items below: · Building Maintenance Services & Contractors – $21K underspend, delay in securing contractors to do works required – will know more once May EOM financials are finalised. · Garden Maintenance – $1.1K underspend, invoice timing. · Swimming Pool Maintenance/Repairs – $5K underspend likely to remain if no breakdown of equipment in June. · Photocopying – $8.5K this budget allowance has been offset by IT as an expense within their budget so will not be expensed. · Printing – $2.8K – this will be expended. · License Fees – $8.6K underspend, likely to be $4K underspend by EOFY due to cancelled Crossfit licence. · Non-Capital Furniture & Office Equipment – $9.6K underspend, pending works likely to expend this by EOFY. · Holiday Program – $2.3K underspend, will be expensed for items for July program. · Leisure Program Activities – $5.6K underspend, this will be expended by EOFY. It is anticipated that there will be an overall underspend in these areas by the EOFY. |
||||||
10600 |
Busselton Jetty Tourist Park |
399,056 |
532,598 |
133,542 |
25.1% |
47,056 |
The variance can be attributed to two outstanding monthly management fee invoices ($41,125 – runs one month in arrears), due to presentation and payment of the invoice. Other expenditure that has not occurred falling within Materials & Contracts are related to non-scheduled maintenance, garden maintenance, purchase of materials, and savings in cleaning materials and disposal of waste fees. |
||||||
10625 |
Art Geo Administration |
49,781 |
61,461 |
11,680 |
19.0% |
3,270 |
Over half of the underspend in ArtGeo is due to unallocated centralised costs for printing and photocopy. The remainder is due to using in house design resources instead of outsourcing to produce signage and interpretation and therefore these underspends are offset in additional wages. |
10630 |
Economic and Business Development Administration |
49,177 |
103,922 |
54,745 |
52.7% |
16,197 |
The budget is made up of numerous line items that have been spread throughout the year. The actual timing for these things are inherently difficult to predict, as more often than not they depend on interactions with outside third parties for development opportunities and collaborations. For example, the City budgets for advertising and marketing, but needs to wait for relevant opportunities to arise throughout the year that may not necessarily align with budget timing. A further $20,114.00 is to be invoiced (Pracsys Economics for Industry Sector Analysis) in June and a couple of smaller amounts leaving a total variance of approx. $19k by year end. |
||||||
11151 |
Airport Operations |
198,949 |
283,110 |
84,161 |
29.7% |
(8,710) |
The budget variance YTD includes the key allocations of: · Security screening of $45K not spent. · Car park design, signage, line marking, repairs and maintenance of approximately $28K. The remainder of the variance relates to commitments for: · COVID screens $6,500. · Apron lighting repairs of approximately $3K. · General grounds maintenance and improvements of approximately $4K. · Technical inspections $5,500. |
||||||
B1361 |
YCAB (Youth Precinct Foreshore) |
37,822 |
52,129 |
14,307 |
27.4% |
19 |
Operating grants forecast were not available as planned and therefore associated expenditure has not occurred. Alternative funding was sourced to run a program in Dunsborough which commenced in February and March. Full invoicing for these activities has not as yet been received, and is also not expected to come in as high as what was originally forecast based on the grant funding. |
||||||
Planning and Development Services |
1,026,607 |
1,840,512 |
813,905 |
44.2% |
58,919 |
|
10810 |
Statutory Planning |
15,669 |
31,207 |
15,538 |
49.8% |
2,744 |
Not possible to predict when consultancy services will be required in advance. In this case, funds have been committed (heritage and traffic advice) but invoices not received. |
||||||
10820 |
Strategic Planning |
174,859 |
222,222 |
47,363 |
21.3% |
2,273 |
Estimated revenues (re-zonings, structure plans) and anticipated consultant contracts (for specialised works seen as likely to be needed for scheduled City projects) are often quite difficult to predict as they are subject to third-party intentions and initiatives, or competing demands and task allocation/prioritisation at the City. |
||||||
10830 |
Environmental Management Administration |
320,896 |
487,535 |
166,639 |
34.2% |
(15,871) |
Expenditure variance due to: · Timing of Barnard Park East management plans contract, due April 2021, pending completion of upgrade works; · Lower Vasse River sediment removal and groundwater investigations were delayed, now due May 2021; and · Carbunup reserve contaminated site investigations due May 2021. Awaiting a number of significant invoices to complete contracts within early June and all outstanding payments will be reconciled prior to the EOFY. |
10920 |
Environmental Health Services Administration |
3,306 |
38,881 |
35,575 |
91.5% |
(210) |
There is an error in the timing of the YTD budget. The full year for contractors is only $5K, however YTD shows $20K, as a budget credit of $15K was processed in June. The YTD variance for this whole area is actually $14,376. The reasons for this $14K underspend include the contractor allocation of $5K to implement audit outcomes being done in house, plus very minimal pre-summer assessments of sound level meters, revealing little to no faults requiring repair, due to 2020 COVID event cancellations. |
||||||
10922 |
Preventative Services – Mosquitoes |
18,774 |
35,532 |
16,758 |
47.2% |
221 |
Variance is attributed to: · Contractors – $1853 underspend due to reduced mosquito trapping being undertaken by contractor. · Consultants – No spend i.e. saving - this allocation was to create a mosquito management plan by consultants, internal staff developed the plan instead. · Chemicals – $8,048 funds available this has been spent as additional chemical were purchased in June and has been paid, In 2020/21, the allocation should be fully expended YTD. · Equipment Repairs & Maintenance – $932 saving due to mosquito trap servicing was not required, only batteries were purchased. · Photocopying – $300 saving as photocopying expenses have not been/needed to be allocated to this cost code. |
||||||
10925 |
Preventative Services – CLAG |
119,098 |
57,913 |
(61,185) |
(105.6%) |
83 |
Due to the much earlier and more significant onset of the Ross River Virus threat, extra chemical applications, transport, etc. were required. Permission was received from the Department of Health to draw extra trust funds for these purposes (see positive variance in Other Income section above). Full reconciliation of the CLAG budget will occur by the end of the financial year. |
||||||
10931 |
Protective Burning & Firebreaks –Reserves |
86,150 |
498,564 |
412,414 |
82.7% |
42,912 |
Spring and Autumn burning mitigation programs now complete with all expenses currently being reconciled. Mechanical mitigation program of approximately $80,000 commence on Monday 3rd May with invoicing for works completed expected to be received in the month of May. All funds expected to be spent by end of FY. Awaiting a number of significant invoices to complete contracts for mitigation works in June. Brigade payments are also being completed for works within 20/21. All outstanding payments will be reconciled prior to the EOFY. |
||||||
10942 |
Bushfire Risk Management Planning – DFES |
155 |
12,738 |
12,583 |
98.8% |
1,158 |
Awaiting final plant costings and reconciliation will be completed and submitted. |
||||||
11170 |
Meelup Regional Park |
76,255 |
174,575 |
98,320 |
56.3% |
7,267 |
Expenditure variance due to timing of awarding Cultural Heritage Assessment (CHA) contract as part of the Meelup Regional Park Management Plan review. Initial request for services did not attract a suitable service provider, delaying the project. Contract for CHA awarded 20 April 2021. $60,000 for Meelup Healthy Country Plan has been approved for relisting in 2021/22, due to timing of completion being extended. No expenses for this will appear within the 20/21 financial year. |
||||||
B1010-B1028 |
Bushfire Brigades – Various |
113,247 |
139,854 |
26,607 |
19.0% |
9,517 |
Emergency operations dependent. YTD actuals vs budget will vary according to emergency operational requirements, and are inherently difficult to predict. All brigade payments will be completed prior to the EOFY and are currently being reconciled. |
Engineering and Works Services |
8,471,040 |
10,082,989 |
1,611,950 |
16.0% |
45,375 |
|
11160/1/2 |
Busselton Jetty |
16,834 |
29,788 |
12,954 |
43.5% |
2,259 |
$32.5k was included on the Jetty budget for Contractor costs for miscellaneous repairs and maintenance and for the replacement of small items under $5,000 as and when required. This budget is used for the replacement of bins, vandalism repairs, minor painting, jetty signage etc. YTD there has been less expenditure of this type than in prior years. |
||||||
12600 |
Street & Drain Cleaning |
292,881 |
401,258 |
108,377 |
27.0% |
(73,888) |
Year to date expenditure for these services began tracking back to budget in May and will continue to do so in June, pursuant to pre-rainy-season drain abduction works that commenced in mid to late April. These works ensure drains are free of debris to mitigate against flooding. This leaves $107K in ongoing works to be invoiced in the final month of June with these works ongoing. This budget is anticipated to be fully expended as at 30 June. |
||||||
12620 & 12621 |
Rural & Urban Tree Pruning |
147,521 |
346,500 |
198,979 |
57.4% |
25,907 |
$247K of expenditure for rural tree pruning and for the removal of urban dead trees and debris was withheld to help offset storm damage clean-up costs incurred in relation to the May 2020 storms. In February 2021 it was confirmed that the City had secured storm claim reimbursement revenue and thus this budget was reinstated. Contractor availability meant that the Rural Tree Pruning budget will be under expended by approx. $150k come June 30. The CEO has notionally agreed that this budget can be carried over into the 2022 financial year. In the wake of the Yallingup fires a further $150k was approved to be spent on cleaning up the verges of rural single access roads. These costs were coded against the individual roads and these works will be completed by June 30. |
||||||
Various |
Bridge Maintenance |
29,399 |
166,111 |
136,712 |
82.3% |
7,521 |
Expenditure on Bridge Maintenance activities was also withheld to the value of $105K to help offset May 2020 storm damage related costs. With the storm costs now having been reimbursed, the budget has been reinstated. It’s difficult to secure Contractor availability for these types of specialised works at short notice; to this end some of the budget will remain unused. $90k of this unspent budget will be carried over into 2022. |
||||||
Various |
Building Maintenance |
1,205,451 |
1,302,653 |
97,202 |
7.5% |
(39,654) |
The year to date underspend variance associated with Building Maintenance decreased by a further $40K in May to $97K. Scheduled maintenance activities on various buildings have been in progress post the busy Easter holiday period. Expenditure has exceeded budget on some buildings while being under budget on others. Come June 30 the majority of this budget will have been outlaid. |
||||||
Various |
Other Infrastructure Maintenance |
1,186,834 |
1,582,680 |
395,846 |
25.0% |
(12,616) |
This category encompasses the consolidation of almost 100 individual Cost Codes representing a unique array of services delivered right across the City. It includes things like: event support; boat ramp maintenance; cemetery maintenance; maintenance at the Libraries and GLC; caravan park maintenance; street lighting installation; the foreshores; the CBD’s; cycleways and footpaths etc. The $396K YTD expenditure variance to budget at the end of May is mostly attributable to timing with the budget having been evenly spread across the financial year. Urban Street lighting installations and the Rural Intersection lighting budgets are under expended to budget $118k; most of this budget will be outlaid come June 30. The Boat Ramp Contractor maintenance budget is under spent to budget by $36k with much of this not anticipated to be outlaid come June 30. The remaining budget for both Strategic Fire Breaks – Maintenance $18k and Cycleway Maintenance Busselton $22k will have been utilised come June 30. |
Various |
Waste Services |
1,837,933 |
2,437,524 |
599,591 |
24.6% |
135,195 |
The YTD under expenditure to budget for Waste Services Consolidated is attributable to many factors including the following: · $145K under expended variance to budget associated with Contamination Site Contractor costs. Environmental based costs such as testing and monitoring were not known at the time of budget preparation; investigations are ongoing. · $123K under expended variance to budget associated with External Waste Disposal being gate house disposal costs at the Cleanaway Dardanup landfill. Some of this is timing pending the receipt of both the April and May monthly invoice. · $95k under expended variance to budget associated with Cleanaway Recycling Collection costs, will all this attributable to timing pending the receipt of the May monthly invoice. · $95K under expended variance to budget associated with the Dunsborough Waste Site. The green waste stock pile will now be processed in the 2022 financial year contributing to this variance. · $67K favourable variance associated with the postponement of the FOGO trail. These funds will net-off against the Waste Reserve with the year-end transfer of funds calculation. |
||||||
Various |
Roads Maintenance |
945,063 |
437,014 |
(508,049) |
(116.3%) |
17,024 |
The higher than normal costs are largely associated with storm damage clean-up costs stemming from the May 2020 storm events, where there has been $403K in extraordinary Material & Contractor costs incurred against Road Maintenance. In February, the City was notified that it will be in receipt of reimbursements that effectively cover and offset against this overspend. The Road Maintenance budget is being carefully managed exclusive of storm-related costs that have been reimbursed. |
||||||
Various |
Reserve Maintenance |
1,370,498 |
1,706,772 |
336,274 |
19.7% |
16,587 |
Significant volumes of works began on the City’s POS Reserves after the Easter public holidays with greater volumes of contractor invoices starting to flow through to the City. Included in the YTD variance is a one-off non-cash stock adjustment that when excluded reduces the YTD variance by $106K leaving $230k under expended to budget YTD. This grouping is comprised of 184 separate POS areas where some are over budget while others are under budget. The following areas are under expended to Contractor budgets YTD and thus explain the YTD variance: · Cultural Precinct $23k · Eastern Link Landscaped Area $20k for maintenance post construction. (will not be outlaid as project currently in progress) · Busselton Foreshore Area $73k · Provence Estate $34k · Vasse Newtown $31k · Vasse Kealy $25 |
||||||
5280 |
Transport - Fleet Management |
1,438,627 |
1,672,689 |
234,062 |
14.0% |
(32,959) |
Fuel and Oil was underspent by $169,782 YTD accounting for 72% of the Fleet YTD variance. An end of year surplus is anticipated but will be less than was anticipated in the mid-year budget review as the fuel price has been on the rise. Fuel consumption across the City is now at its highest level as many large Civil works projects are now underway. Tyre purchases are underspent by $1,885 YTD and replacement parts/tooling/contractor costs are underspent $62,395 YTD. |
5. Other Expenditure
$1.05M, or 31.3%, under the budget YTD. The main contributing items are listed below:
Cost Code |
Cost Code Description |
Actual YTD $ |
Amended Budget YTD $ |
Variance |
Variance |
Change in Variance Current Month $ |
Executive Services |
68,368 |
100,217 |
31,849 |
31.8% |
4,374 |
|
10001 |
Office of the CEO |
67,298 |
100,217 |
32,919 |
32.8% |
4,631 |
The underspend relates to donations contributions and subsidies budget ($10K), CapeROC budget ($16K) and the CEO Discretionary Budget ($7K). |
||||||
Finance and Corporate Services |
745,670 |
886,981 |
141,311 |
15.9% |
(44,074) |
|
10000 |
Members of Council |
433,702 |
499,478 |
65,776 |
13.2% |
821 |
Timing variances exist in relation to the payment of elected member allowances and reimbursements. The main contributors being $23K related to timing variances in payment of sitting fees, the elected members training budget underspent by $16K, and no expenditure against the Council holding account with a YTD budget of $11K. The timing variances for expense reimbursements are difficult to predict when budgeting. |
||||||
10151 |
Rates Administration |
87,458 |
105,963 |
18,505 |
17.5% |
(53,280) |
Budget variances are due to interim valuation invoices still to be received. |
||||||
10700 |
Public Relations |
77,412 |
117,972 |
40,560 |
34.4% |
8,424 |
The underspend variance is related to a reduced payment to BASSCA this year given COVID-19 and no school exchanges, the cancelling of the Mayoral Breakfast and a reduced spend associated with functions such as the launch of Jetstar flights. |
||||||
Community and Commercial Services |
1,021,633 |
2,028,854 |
1,007,221 |
49.6% |
(19,806) |
|
10530 |
Events & Cultural Services Administration (formerly Community Services Administration) |
484,819 |
649,773 |
164,954 |
25.4% |
(12,480) |
Funds currently committed from the 2020/21 events budget through multi-year agreements and Rounds 1 and 2 of the Event Sponsorship Program totals $380,562. In addition, $200,000 is allocated towards the development of an electronic events billboard. This leaves a balance of $205,852 in the 2020/21 events budget for any further event attraction or initiatives. This balance includes funds from cancelled events. Of the $250,000 allocated to the 2020/21 marketing budget, $120,000 has been allocated to the Airport Marketing Reserve, $50,000 to the Busselton Performing Arts and Convention Centre (BPACC), up to $12,000 had been allocated to update the City’s Events Strategy and up to $5,000 for the update of tourism signage, leaving a balance of $63,000 for any further initiatives. It is recommended that the remaining balance after any further allocations be transferred to the Airport Marketing Reserve. Of the $40,000 allocated to City run events, a total of $11,684 was spent on seven Sun-Sets on the Bay events in Busselton and Dunsborough. This leaves a balance of $28,316. Pending any further initiatives, the remaining balance at the end of financial year will remain in the Marketing and Area Promotion Reserve. |
||||||
10532 |
BPACC Operations |
11,668 |
50,000 |
38,332 |
76.7% |
5,000 |
Low cost marketing materials have been developed to date and until final decisions are made regarding the project tenders, no large investments in event attraction will be made. |
10547 |
Iron Man |
- |
200,000 |
200,000 |
100.0% |
- |
Ironman has been cancelled for this year and hence the funds will not be expended. Council have resolved (C2012/159 – 9 December 2020) to utilise the remaining budget towards an electronic billboard, however this will not likely be completed until closer to the end of the financial year. |
||||||
10550 |
Forrest Rally |
- |
12,500 |
12,500 |
100.0% |
- |
Forrest Rally organisers have advised that the event will not be proceeding from 2020/2021 onwards, therefore these funds will not be expended. |
||||||
CinefestOZ |
80,000 |
120,000 |
40,000 |
33.3% |
- |
|
YTD variance is due to the sponsorship contract being varied due to a change in format as a result of COVID (C2009/110) - $80K paid in 2020/21 with the balance ($38k) carried over to be paid in addition to 2021/22 Market Yield Adjustment. |
||||||
10625 |
Art Geo Administration |
11,743 |
23,992 |
12,249 |
51.1% |
(711) |
Underspend is offset by additional wages due to in house production of marketing, promotional and interpretation work. |
||||||
10630 |
Economic and Business Development Administration |
3,440 |
39,346 |
35,906 |
91.3% |
15,654 |
The budget is made up of numerous line items that have been spread throughout the year. The actual timing for these things are inherently difficult to predict, including valuations as more often than not they depend on interactions with outside third parties for development opportunities and collaborations. For example, the City budgets for marketing and promotions, but need to wait for relevant opportunities to arise throughout the year that may not necessarily align with budget timing. It should be noted that a large portion of the total annual budget ($55K) relates to cruise ship visitor servicing ($38K), which due to the effects of COVID-19 will not be spent by the end of the financial year. |
||||||
10634 |
Business Support Program |
72,522 |
97,988 |
25,466 |
26.0% |
(1,092) |
There are a number of grants that are being finalised by applicants. Once these have been completed, then the City will pay out the grant funds. There is also an amount of $19K that has not been allocated from the total annual budget that will be reflected in the variance at year end. |
||||||
5,276 |
420,741 |
415,465 |
98.7% |
(5,148) |
||
Relates to marketing activities for RPT services which have not commenced due to COVID. |
||||||
Planning and Development Services |
152,894 |
158,152 |
5,258 |
3.3% |
1,215 |
|
10805 |
Planning Administration |
29,148 |
55,000 |
25,852 |
47.0% |
5,000 |
This variance relates to the façade refurbishment program which is not likely to have any additional projects / work costed to it this financial year as the City has not run the program as per normal because of unusually high workloads caused by the building stimulus. |
||||||
10931 |
Protective Burning & Firebreaks-Reserves |
3,804 |
16,115 |
12,311 |
76.4% |
(790) |
Due to the limited seasonal burning opportunities, the budget for catering for the crews has not been spent as expected YTD. |
||||||
10942 |
Bushfire Risk Management Planning – DFES |
23,466 |
- |
(23,466) |
(100.0%) |
- |
This represents repayment of unspent 19/20 BRMP grant funds. |
||||||
Engineering and Works Services |
323,319 |
191,468 |
(131,851) |
(68.9%) |
(181,217) |
|
B1223 |
Micro Brewery - Public Ablution |
60,000 |
120,000 |
60,000 |
50.0% |
- |
The City’s fund contribution to the construction of these ablutions is due to be paid upon receipt of invoice from the company. Final inspection of the toilet facilities was expected late March, after which the invoice should have been forthcoming. |
||||||
G0042 |
BTS External Restoration Works |
237,879 |
45,837 |
(192,042) |
(419.0%) |
(180,960) |
There was an unforeseen cost increase in groundwater monitoring due to a laboratory error by our third party contractor. The round of testing conducted in November included the sampling of over 50 groundwater bores, many of which reported “anomalous results”. The contractor concluded that the lab had made errors in mis-labelling samples, which required re-sampling. Although the lab did not charge us for additional testing due to their error, the City incurred extra costs when it had to re-engage the contractor to re-test several dozen bores in January. The City’s Legal department is investigating whether compensation from the contractor can be pursued. In May, a legal settlement payout that was made in November 2020 was re-allocated from capital per advice from the Office of Auditor General, as these costs are not capital in nature. |
6. Non-Operating Grants, Subsidies & Contributions
The negative variance of $8.6M is mainly due to the items in the table below. It should be noted that apart from the first two items in the table (the Locke Estate Contributions variance is due to COVID hardship deferral relief), any negative variance in this area will approximately correlate to an offsetting variance in a capital project tied to these funding sources. This can be seen in the section below that outlines the capital expenditure variances. The positive variances generally relate to budget timing, i.e. the funds are usually brought to account during the end of financial year reconciliation process, so hence are budgeted in June.
Revenue Code |
Revenue Code Description |
Actual YTD $ |
Amended Budget YTD $ |
Variance |
Variance |
Change in Variance Current Month $ |
Finance and Corporate Services |
46,678 |
60,000 |
(13,322) |
(22.2%) |
(4,000) |
|
R0288 |
Locke Estate – Leaseholder Contributions |
46,678 |
60,000 |
(13,322) |
(22.2%) |
(4,000) |
Community and Commercial Services |
156,039 |
38,851 |
117,188 |
301.6% |
133,039 |
|
10590 |
Naturaliste Community Centre – Developer Contributions Utilised |
23,000 |
- |
23,000 |
100.0% |
- |
10900 |
Cultural Planning – Donated Assets |
51,000 |
- |
51,000 |
100.0% |
51,000 |
C6025 |
Installation of Bird Netting – State Capital Grant |
82,039 |
38,851 |
43,188 |
111.2% |
82,039 |
Planning and Development Services |
502,478 |
- |
502,478 |
100.0% |
- |
|
10980 |
Other Law, Order & Public Safety – Donated Assets |
8,231 |
- |
8,231 |
100.0% |
- |
B1025 |
Yallingup Coastal Bushfire Brigade – Donated Assets |
10,592 |
- |
10,592 |
100.0% |
- |
C3223 |
Dunsborough Non-Potable Water Network – Federal Capital Grant |
483,655 |
- |
483,655 |
100.0% |
- |
Engineering and Works Services |
4,883,864 |
14,121,209 |
(9,237,345) |
(65.4%) |
(2,148,102) |
|
A0023 |
Kaloorup Road Bridge – 3381 – Donated Asset |
- |
936,000 |
(936,000) |
(100.0%) |
(936,000) |
A0024 |
Boallia Road Bridge – 4854 – Donated Asset |
- |
1,009,000 |
(1,009,000) |
(100.0%) |
(1,009,000) |
A0025 |
Tuart Drive Bridge 0238 – Federal Capital Grant |
- |
170,330 |
(170,330) |
(100.0%) |
- |
B9407 |
Busselton Senior Citizens – Developer Cont. Utilised |
595,306 |
162,479 |
432,827 |
266.4% |
- |
B9591 |
Performing Arts Convention Centre – Federal Capital Grant |
- |
5,175,000 |
(5,175,000) |
(100.0%) |
- |
B9999 |
Donated Buildings (Micro-Brewery Public Toilets) |
110,000 |
- |
110,000 |
100.0% |
- |
C0059 |
Dunsborough Yacht Club Carpark – Developer Cont. |
60,000 |
- |
60,000 |
100.0% |
- |
C1026 |
Townscape Works Dunsborough – State Capital Grant |
10,000 |
- |
10,000 |
100.0% |
- |
C3116 |
Dawson Park (McIntyre St POS) – Developer Cont. |
- |
77,467 |
(77,467) |
(100.0%) |
- |
F1022 |
Buayanyup Drain Shared Path – State Capital Grant |
- |
293,337 |
(293,337) |
(100.0%) |
(26,667) |
S0005 |
Ludlow Hithergreen Road - Second Coat Seal – Main Roads Capital Grant |
360,000 |
412,500 |
(52,500) |
(12.7%) |
(37,500) |
S0048 |
Bussell Highway – Developer Cont. Utilised |
200,000 |
458,337 |
(258,337) |
(56.4%) |
(41,667) |
S0070 |
Peel & Queen Street Roundabout Service Relocation – Developer Cont. Utilised |
320,000 |
800,000 |
(480,000) |
(60.0%) |
200,000 |
S0072 |
Kaloorup Road - Reconstruct and Seal Shoulders – Developer Cont. Utilised |
100,000 |
- |
100,000 |
100.0% |
- |
S0073 |
Gale Road Rural Reconstruction – Federal Capital Grant |
515,811 |
1,258,114 |
(742,303) |
(59.0%) |
(114,374) |
S0074 |
Causeway Road Duplication – Developer Cont. Utilised |
800,000 |
300,000 |
500,000 |
166.7% |
- |
S0075 |
Local Road and Community Infrastructure Program – Federal Capital Grant |
688,143 |
765,951 |
(77,808) |
(10.2%) |
- |
S0076 |
Kaloorup Road (Stage 1) – Main Roads Direct Grant |
106,800 |
- |
106,800 |
100.0% |
- |
T0020 |
Capel Tutunup Road – RTR Capital Grant |
- |
1,307,834 |
(1,307,834) |
(100.0%) |
(118,894) |
W0067 |
Ford Road Reconstruct and Asphalt Overlay – Main Roads Direct Grant |
10,875 |
- |
10,875 |
100.0% |
- |
W0121 |
Geographe Bay Road Quindalup – Developer Cont. Utilised |
12,000 |
- |
12,000 |
100.0% |
- |
7. Capital Expenditure
As at 31 May 2021, there is an underspend variance of 49.9%, or $22.2M, in total capital expenditure, with YTD actual at $22.3M against the YTD amended budget of $44.5M. A portion of this positive underspend variance is offset by the negative variance in Non-Operating Grants, Contributions & Subsidies discussed above, with the remainder offset by the negative variances in Transfers From Reserves related to funds held aside for these projects. The attachments to this report include detailed listings of all capital expenditure (project) items, however the main areas of YTD variance are summarised as follows:
Cost Code |
Cost Code Description |
Actual YTD $ |
Amended Budget YTD $ |
Variance |
Variance |
Change in Variance Current Month $ |
||
Land |
950 |
75,000 |
74,050 |
98.7% |
(950) |
|||
10610 |
Property Services Administration |
950 |
75,000 |
74,050 |
98.7% |
(950) |
||
The budget represents funds allocated for costs associated with potential strategic land purchases in the City of Busselton. To date, there have been no expenses incurred, as potential transactions have not progressed beyond informal discussions. |
||||||||
Buildings |
3,154,157 |
8,806,049 |
5,651,892 |
64.2% |
1,718,980 |
|||
B9516 |
Busselton Library Upgrade |
555,092 |
603,000 |
47,908 |
7.9% |
36,350 |
||
Library works completed. Balance of funds to be directed to fit-out items. |
||||||||
B9300/1/2 |
Aged Housing Capital Improvements |
64,128 |
179,600 |
115,472 |
64.3% |
2,386 |
||
Budgeted works were proposed to separate power and drainage servicing Winderlup Court and Winderlup Villas. Whilst the power requirements are not triggered until the new conditional land title lots are created, the intention was to progress with this anyway. The procurement process has elicited one quotation only which, even if acceptable is unlikely to generate an invoice payable in the current financial year. As such the budgeted funds will be carried over in reserve to be utilised once appropriate contractual arrangements can be made. |
||||||||
B9402 |
Busselton Waste Transfer Station - Buildings |
18,206 |
- |
(18,206) |
(100.0%) |
(18,206) |
||
A requirement arose for a 2.4 x 2.4 Transportable Ablution Block, and savings were identified in the budget for infrastructure that could be utilised for these purposes. This overspend variance will be offset by the identified underspends in infrastructure. |
||||||||
B9407 |
Busselton Senior Citizens |
626,400 |
738,128 |
111,728 |
15.1% |
(917) |
||
Works were completed in September. The savings against budget are being reviewed for potential use on roof replacement and carpark works. Works have been re-scoped based on preliminary estimates to reduce costs of roof replacement. The tender to perform these works has now been awarded, and is expected to be completed by the end of the financial year. |
||||||||
B9558 |
Churchill Park - Change Room Refurbishment |
- |
21,000 |
21,000 |
100.0% |
- |
||
Works are scheduled to be completed before the end of the financial year. Procurement for roof sheeting is currently underway. |
||||||||
B9591 |
Performing Arts Convention Centre |
1,344,449 |
6,362,563 |
5,018,114 |
78.9% |
1,637,768 |
||
Regional Growth Fund milestones are under review pending funding extension confirmation. Design contract program extension pending. Budgeted cash flow has been reviewed, with works now pending final Council decision on the tenders. |
||||||||
B9596 |
GLC Building Improvements |
62,543 |
450,681 |
388,138 |
86.1% |
192,260 |
||
Carried over works from the prior year. Works have now been completed with reconciliation of the final progress claims expected to be completed in May. Payment should follow shortly thereafter and is expected to fully utilise this budget. |
||||||||
B9607 |
General Buildings Asset Renewal Allocation (Various Buildings) |
112,921 |
137,500 |
24,579 |
17.9% |
11,636 |
||
This budget was assigned for various Capital works as identified as per the City’s Building Asset Management Plan. Some items of expenditure have been for undertaking maintenance as opposed to Capital renewal works. To this end, $44k in costs incurred have been moved back and recorded against Operations in the June period. These major maintenance works will still be funded from the Building Reserve, however an under-expended position to budget will result against this item. |
||||||||
B9608 |
Demolition Allocation (Various Buildings) |
- |
12,500 |
12,500 |
100.0% |
2,011 |
||
Funds were initially allocated to partial demolition of the Weld Theatre by the end of the financial year, in preparation for its integration with the BPACC. Final Council decision on this project is now pending due to further review of tenders. |
||||||||
B9610 |
Old Butter Factory |
277,434 |
- |
(277,434) |
(100.0%) |
(145,885) |
||
Conservation and fire damage works were completed early in the financial year. A journal for $145k representing costs associated with the Wood Turners relocation to the Old Butter Factory site was processed in May and hence the end of month $277k unfavourable variance; this JNL has since been reversed back out in June bringing the variance back to its original $131k. An Insurance claim reimbursement totalling $99.4k offsets the true costs of $131k leaving a net over spent to budget of $32k come June 30. |
||||||||
B9612 |
Churchill Park Renew Sports Lights |
181 |
140,000 |
139,819 |
99.9% |
- |
||
A review of consultants work to date has been undertaken and Council has endorsed a grant application to the State Government for this site. If the application is accepted (response expected in June), budgeted expenditure will be carried forward into the 21/22 budget year. If not, much of this budget will be spent by the end of this this financial year. |
||||||||
B9711 |
Busselton Airport – Building |
- |
15,000 |
15,000 |
100.0% |
- |
||
Small capital works projects to be completed either prior to Jetstar flights commencing or by the end of the financial year. |
||||||||
B9717 |
Airport Construction - Existing Terminal Upgrade |
3,416 |
39,237 |
35,821 |
91.3% |
151 |
||
As per above. |
||||||||
B9809 |
Busselton Jetty Tourist Park Compliance Works |
3,600 |
40,000 |
36,400 |
91.0% |
- |
||
Compliance electrical works to be completed by the end of the financial year. |
||||||||
Plant & Equipment |
1,234,932 |
2,473,982 |
1,239,050 |
50.1% |
(9,570) |
|||
10372 |
Dunsborough Cemetery |
- |
20,000 |
20,000 |
100.0% |
- |
||
The budget is for maintenance trailers for the cemetery, both for grave shoring equipment and watering equipment, as well as fencing and turf upgrades. The delay in procurement of these items is due to current workloads of relevant staff and other projects taking a higher priority to date. Suitable specifications have now been developed and quotes are being sought, however the new equipment is not expected to be delivered until August 2021. As such, these budgeted funds will remain in reserve and be relisted to be drawn in the 21/22 budget. |
||||||||
11106 |
Street Lighting Installations |
17,300 |
- |
(17,300) |
(100.0%) |
- |
|
The expenditure represents a storage container for the lighting equipment. The budget for the whole activity has been entered against one operational line incorrectly, rather than being split according to operational maintenance, capital upgrade, and one-off asset purchases such as this. |
|||||||
11156 |
Airport Development Operations |
199,403 |
259,512 |
60,109 |
23.2% |
23,592 |
|
All baggage handling system invoices have been invoiced and paid. The remaining funds will be included in the outstanding Airport Development funding balance. |
|||||||
11162 |
Busselton Jetty - Underwater Observatory |
17,523 |
- |
(17,523) |
(100.0%) |
- |
|
In February there was $17.5K in unplanned expenditure for an Uninterrupted Power Supply (UPS) for the Underwater Observatory (UWO) lift. This will be funded from the Jetty Reserve. |
|||||||
11401 |
Transport – Workshop |
19,227 |
30,000 |
10,774 |
35.9% |
- |
|
The hardware for upgrades to the repeater at the communications tower has been delivered. Installation of these will be dependent upon receiving Telstra approvals, which is being worked through by Property and Leasing, but will take place in 21/22 FY. |
|||||||
11402 |
Plant Purchases (P10) |
596,461 |
1,420,000 |
823,539 |
58.0% |
- |
|
Underspend variances to budget YTD are due to: · The new generators at DWF pond and cell that were ordered in April, with delivery of one unit in June and the second in July. (carryover listed in the 21/22 budget); · The waste manager’s new replacement vehicle to be ordered and delivered in May; · A waste truck side loader that has been ordered, but delivery/payment is not expected until August (this underspend saving will be a carry-forward purchase from the Plant Reserve in the 21/22 budget); · The waste compactor semi-trailer purchase has been deferred indefinitely pending development of the new waste plan. |
|||||||
11403 |
Plant Purchases (P11) |
46,995 |
202,500 |
155,505 |
76.8% |
2,500 |
|
One ute ordered with delivery delayed until July and one light truck ordered in December, delivery now delayed until July. Both listed as carryovers in the 21/22 budget. |
|||||||
11404 |
Plant Purchases (P12) |
8,923 |
114,000 |
105,077 |
92.2% |
(8,923) |
|
One light truck ordered with delivery expected in July. Listed as carryover in the 21/22 budget. |
|||||||
11407 |
P&E - P&G Smart Technologies |
- |
91,663 |
91,663 |
100.0% |
8,333 |
|
The annual scope of the project is currently being finalised and delivery will follow in the last quarter of 20/21. |
|||||||
Furniture & Office Equipment |
449,887 |
458,088 |
8,201 |
1.8% |
(176,068) |
||
10250 |
Information & Communication Technology Services |
262,104 |
407,088 |
144,984 |
35.6% |
(47,182) |
|
Some of the delayed projects (COVID impacts include consultancy availability, hardware supply chain and additional unplanned IT work) have been accelerated in the new year including the hardware refresh, phone line migration, single label domain, and online payments. It is however expected that some projects, including portions of the website build and laptop replacements will be carried over to the subsequent financial year. The funding for these elements will also remain in reserve and be carried over to fund the expenditure when it occurs. |
|||||||
10591 |
Geographe Leisure Centre |
71,380 |
20,000 |
(51,380) |
(256.9%) |
(51,620) |
Pool covers worth $51K were purchased. The overspend in this budget area is offset by forecast underspends in the GLC building upgrade area. |
||||||
10900 |
Cultural Planning |
56,000 |
12,000 |
(44,000) |
(366.7%) |
(44,000) |
Completion of the Slippery Rocks bronze sculpture for $51K, plus $5K for the winning sculpture competition. |
||||||
Infrastructure By Class |
|
|
|
|
|
|
Various |
Roads |
10,876,579 |
14,245,367 |
3,368,788 |
23.6% |
(332,156) |
Major civil road construction works are now underway in many locations across the City by both the City’s two road construction teams and Contractors. The large Gale Rural Road project originally estimated at $1.437M has commenced and is nearing completion; it is estimated to come in under budget by approx. $400K; due to competitive contractor pricing. There will also an underspend associated with the Peel & Queen Street Roundabout project (S0070) valued at $1.2M as the majority of these works will be carried over into 2022. Stage 1 Blackspot works on Kaloorup Road vales at $410k although recently started will also not be completed by June 30. These projects are contributing to the current $3.368M YTD variance. The projects below comprise 83% of the variance. · S0076 Kaloorup Road (Stage 1) $366,987 · S0073 Gale Road Rural Reconstruction $485,860 · S0048 Bussell Highway $554,347 · T0020 Capel Tutunup Road $622,596 · S0070 Peel & Queen Street Roundabout $771,099 TOTAL YTD underspent to budget $2,800,887 |
||||||
Various |
Bridges |
4,872 |
4,303,489 |
4,298,617 |
99.9% |
2,091,624 |
Although Bridge renewal works will be done on both the Bussell Highway and Yallingup Beach Road bridges this financial year it is unlikely any expenditure will be recorded due to the requirement for formal notification of completion from Main Roads and of invoices from them. Main Roads carry out these works on behalf of the City. Works on the Kaloorup, Boallia Road and Tuart Drive Bridges are now scheduled to commence in the 2022 Financial year. To this end an under expended variance to budget totalling $6.4M is anticipated come 30 June. All 5 bridge projects will represent carry overs. |
||||||
Various |
Car Parks |
1,222,880 |
1,709,053 |
486,173 |
28.4% |
34,754 |
Car Park projects are generally progressing well although there is a $486K under expended variance to budget YTD. 54% of the YTD variance is attributable solely to the Car Parking associated with the Barnard East Development with the majority of construction to occur in 2022. Both the Baudin Memorial & Administration Building Carpark projects will start in earnest and are scheduled to be completed by June 30; they have a combined YTD variance to budget of $152k. |
||||||
Various |
Footpaths & Cycleways |
330,241 |
1,316,335 |
986,094 |
74.9% |
24,852 |
The YTD variance associated with Footpath & Cycleway projects grew by a further $24.8K to the end of May. This is primarily attributable to the Buayanyup Drain Shared Path project that is soon to commence which represents 58%, or $576K of the YTD variance. There has been a number of unforeseen complexities associated with this project. An extension to the 50% Regional Bike Network grant associated with this project has been secured and the project is scheduled to be completed by the end of July 2021. Contributing a further $232K in combined under expenditure to budget are the Bussell Highway Footpath Sections Project and the Dunsborough Centennial Park Footpath Project where the budget for these have been earmarked and re-assigned to cover additional Queen Street Paving costs. |
Various |
Parks, Gardens & Reserves |
4,688,523 |
10,195,699 |
5,507,176 |
54.0% |
81,733 |
79% representing $4.373M of the YTD variance in this category is attributable to only the four projects listed below: 1. Dunsborough Lakes Sporting Precinct (Stage 1); Civil works to begin soon but the majority of the budget to be carried over and added to Stage 2. 2. Craig Street Groyne and Sea Wall; works progressing with progress claims anticipated in both May and June. 3. Site Rehabilitation – Busselton; works postponed in lieu of site settling, survey and levelling. 4. Mitchell Park Upgrade; works commenced but the contractor went into Administration with the majority of this Budget to be carried over into the 2022 Financial year. Further to the above, in excess of $1M of the YTD variance is attributable to the numerous Public Open Space upgrade projects using Cash in Lieu of Public Open Space contributions; these works will commence in the 2022 Financial Year. |
||||||
Various |
Drainage |
33,552 |
89,019 |
55,467 |
62.3% |
3,396 |
There are only three small drainage related projects on budget this financial year. Both the Glenmeer Ramble and Chugg Road Drainage Upgrade projects are scheduled to commence in the last quarter of the financial year. |
||||||
Various |
Regional Airport & Industrial Park Infrastructure |
269,234 |
790,895 |
521,661 |
66.0% |
(15,115) |
The car park works have been completed but not paid at the time of this report. The most significant part of the underspend relates to noise amelioration works which is funded from grant funds held in reserve. This will be partially invoiced by the end of the financial year, but depending on construction timelines, the rest will remain on the Airport development budget for future noise amelioration. Unspent funds will therefore remain in the reserve. |
8. Proceeds From Sale of Assets
YTD proceeds from sale of assets is $242K behind budget due to delays in delivery of acquisitions, and the associated transfer to auction of the vehicles being replaced.
Also, aside from a significantly reduced capital replacement program in both light vehicles and heavy plant items, many existing items of plant that were due to be replaced have been retained in service to maintain operational requirements.
9. Proceeds From New Loans
$7.5M of the budgeted proceeds of $7.7M are related to the planned drawdown on the construction loan for the BPACC. This project has been deferred in consultation with the Federal Government. The tender process has been completed and Council is now reviewing its options regarding this project. No drawdown is expected this financial year.
The remaining $200K of the variance is offset by advances to community groups which have not occurred at this point in time.
10. Repayment of Capital Lease
The budget was being finalised during the first COVID lockdown. As such, the timing was not set as accurately as it could have. The timing difference YTD will rectify by the end of June.
11. Advances to Community Groups
No applications have been approved to date. The $200K positive variance is offset by the non-receipt of the associated loans funds that the City would receive for these on-lending purposes.
12. Transfer to Restricted Assets
There is a YTD variance in transfers to restricted assets of $5.4M more than amended budget.
At the time of budgeting it is not possible to predict what grants will be received in what timeframe, nor when they will be spent and hence potentially transferred to restricted assets beforehand. The following grants, totaling $2.5M, have been received and transferred to restricted assets for which there is no budgeted transfer and full acquittal completed:
· Grant funding received from Federal Government for “Drought Communities Program” of $500K (attributable to CC C3223 Dunsborough Non-Potable Water Network) was received in September and another $200K received in March. Budget projected allocation was in June as was the anticipated expenditure, hence no necessity to budget for a transfer to restricted assets;
· $841K of the $1.6M grant for the Dunsborough Lakes Sporting Fields Development was received in March;
· $855K 3rd instalment of the annual Roads to Recovery Grant allocation that has not been fully acquitted by YTD March;
· $128K from the Department of Transport for the Buayanyup Drain Shared Path project.
Developer contributions, deposits and bonds are inherently hard to predict and budget for. An annual amount of $63K spread evenly over 12 months was budgeted, however over $2.9M has been received YTD, the bulk of which are for road works bonds ($2.4M).
13. Transfer from Restricted Assets
YTD there has been $2.6M transferred from restricted assets into the Municipal Account. This was mainly attributable to refunds of road work bonds of $1.5M, refund of hall deposits of $28K, Busselton Jetty Tourist Park deposit refunds of $394K, $507K spent from the Dunsborough Non-Potable Water Network grant, $130K of town planning bonds, and other sundry refunds of $53K.
The variance to YTD budget for these items is due to majority of the transfers being forecast to occur in June.
14. Transfer from Reserves
YTD there has been $9.7M transferred from reserves into the Municipal Account, compared to a budget of $6.1M. The discrepancy is caused by the earlier than expected completion of many reserve funded capital projects, most notably $2.8M of road works, with the transfers budgeted to occur in June.
Investment Report
As at 31 May 2021, the value of the City’s invested funds totalled $80.3M, no change from $82.2M as at 30 April 2021.
The balance of the 11am account (an intermediary account which offers immediate access to the funds compared to the term deposits and a higher rate of return compared to the cheque account) remained constant at $7.0M.
During the month of May five term deposits totalling the amount of $10.5M matured. One deposit was closed totalling $2.0M to provide funds for standard operations. Remaining deposits were renewed for a further 153 days at 0.32% on average.
The official cash rate remains steady for the month of May at 0.10%. This will have a strong impact on the City’s interest earnings for the foreseeable future.
Chief Executive Officer – Corporate Credit Card
Details of transactions made on the Chief Executive Officer’s corporate credit card during May 2021 are provided below to ensure there is appropriate oversight and awareness.
Date |
Payee |
Description |
$ Amount |
||
5/05/21 |
OCEAN CENTRE HOTEL GERALDTON |
ACCOMMODATION - TOURISM COUNCIL WA REGIONAL CONFERENCE - MAYOR G. HENLEY |
$340.00 |
||
5/05/21 |
OCEAN CENTRE HOTEL GERALDTON |
ACCOMMODATION - TOURISM COUNCIL WA REGIONAL CONFERENCE- CR K. COX |
$376.50 |
||
6/05/21 |
THAI LEMONGRASS |
COUNCILLOR DINNER 5.05.2021 |
$400.00 |
||
14/05/21 |
ZONTA CLUB DUNSBOROUGH |
PEARL ANNIVERSARY LUNCH 12.06.21 |
$70.00 |
||
18/05/21 |
LG PROFESSIONALS WA |
NETWORK FORUM 2021 REGISTRATION - STAFF |
$400.00 |
||
|
|
TOTAL |
$1,586.50 |
||
Statutory Environment
Section 6.4 of the Act and Regulation 34 of the Regulations detail the form and manner in which a local government is to prepare financial activity statements.
Relevant Plans and Policies
There are no relevant plans or policies to consider in relation to this matter.
Financial Implications
Any financial implications are detailed within the context of this report.
Stakeholder Consultation
No external stakeholder consultation was required or undertaken in relation to this matter.
Risk Assessment
An assessment of the potential implications of implementing the officer recommendation has been undertaken using the City’s risk management framework, with risks assessed taking into account any controls already in place. No risks of a medium or greater level have been identified.
Options
The Statements of Financial Activity are presented in accordance with Section 6.4 of the Act and Regulation 34 of the Regulations and are to be received by Council. Council may wish to make additional resolutions as a result of having received these reports.
CONCLUSION
As at 31 May 2021, the City’s net current position stands at $4.96M. The City’s financial performance is considered satisfactory, and cash reserves remain strong.
TIMELINE FOR IMPLEMENTATION OF OFFICER RECOMMENDATION
Finance Committee 61 21 July 2021
6.3 APPLICATION FOR RATE EXEMPTION - GROUP TRAINING SOUTH WEST INC.
LEADERSHIP - A Council that connects with the community and is accountable in its decision making. |
|
STRATEGIC PRIORITY |
4.2 Deliver governance systems that facilitate open, ethical and transparent decision making. |
SUBJECT INDEX |
Rates & Exemptions |
BUSINESS UNIT |
Finance and Corporate Services |
REPORTING OFFICER |
Rates Coordinator - David Nicholson |
AUTHORISING OFFICER |
Manager Governance and Corporate Services - Sarah Pierson |
NATURE OF DECISION |
Executive: Substantial direction setting, including adopting budgets, strategies, plans and policies (excluding local planning policies); funding, donations and sponsorships; reviewing committee recommendations |
VOTING REQUIREMENT |
Absolute Majority |
ATTACHMENTS |
Attachment
a Rate Exemption
Application⇩ Attachment b Property Use Statement⇩ Attachment c Financial Statements⇩ |
That the Council: 1. Grant rate exemption to Group Training South West Inc. for 1/18 Trumper Drive Busselton, effective 16 December 2020, under section 6.26(2)(g) of the Local Government Act 1995; and 2. Agree that this rate exemption is to continue where Group Training South West Inc. confirm in writing by 30 April annually that they continue use the property for the purposes stated in the application. |
EXECUTIVE SUMMARY
An application seeking rate exemption on 1/18 Trumper Drive, Busselton (the Property) was received from Group Training South West Inc. (GTSW) on 16 December 2020 (Attachment A). The Property is owned by GTSW and is used predominately to deliver training and education for apprentices and students. In accordance with the GTSW “Property Use” statement (Attachment B), the Property is also used to provide other services. Based on GTSW’s financial report, the majority of its income is from client receipts for the services it provides. As education is defined as a charitable purpose, this report recommends that rate exemption be granted under section 6.26(2)(g) of the Local Government Act 1995 (the Act) effective from 16 December 2020, when the application was received.
BACKGROUND
On 16 December 2020, the City received an application from GTSW seeking rate exemption on 1/18 Trumper Drive, Busselton. Despite having owned the Property since June 2000, this is the first time GTSW has lodged a rate exemption application with the City.
GTSW is a “not-for-profit” organisation and has been deemed income tax exempt by the Australian Taxation Office.
The training, education and other services provided by GTSW are almost wholly funded from customer receipts, therefore careful consideration of GTSW’s eligibility for rate exemption has been undertaken by City officers. Having completed this assessment, officers consider GTSW to be eligible for rate exemption.
Engagement with Western Australian Local Government Association (WALGA)
With respect more broadly to rate exemptions for charitable organisations, following a Council resolution in May 2019, the Mayor raised this issue with the South West Zone of WALGA (SWZ) at its meeting, also in May 2019. The SWZ supported the City of Busselton’s view unanimously and resolved as follows:
That the SWZ:
1. Request that WALGA continue to lobby the State Government to consider the removal of rate exemptions for charitable organisations under the Local Government Act 1995 and that an alternative position may be implementing a rebate similar to the Pensioners and Seniors Rebate Scheme.
In response to the SWZ’s resolution, WALGA advised that the SWZ’s position is consistent with the following long-held sector position that:
1. There is a need to amend the Local Government Act to clarify that Independent Living Units should only be exempt from rates where they qualify under the Commonwealth Aged Care Act 1997; and
2. Either:
a. amend the charitable organisations section of the Local Government Act 1995 to eliminate exemptions for commercial (non-charitable) business activities of charitable organisations; or
b. establish a compensatory fund for Local Governments, similar to the pensioner discount provisions, if the State Government believes charitable organisations remain exempt from payment of Local Government rates.
WALGA also added to its submission to the State Government following the consultation on phase 2 of the review of the Act:
Request that a broad review be conducted into the justification and fairness of all rating exemption categories currently prescribed under Section 6.26 of the Local Government Act.
WALGA’s advocacy position has not changed in relation to this issue and it continues to push for meaningful legislative change in this area. Until then, however, the current approach to rate exemptions due to charitable purpose remains in place.
OFFICER COMMENT
In accordance with Section 6.26(2)(g) of the Act, land is not rateable if it is used exclusively for charitable purposes.
Rate exemption applications need only to be considered in two parts. The first part is to assess whether the use itself is “charitable” and the second part is to determine whether the property is being used “exclusively” for such a charitable use.
In considering the first part, that is, ‘are the operations of GTSW considered to be a charitable use’, legal opinions have been consistent in defining a charitable purpose as land used for:
1. The relief of poverty;
2. The advancement of education;
3. The advancement of religion; and
4. Other purposes beneficial to the community.
The Property has been owned by GTSW since at least June 2000 and is used to provide training, educational and apprenticeship services. These services are provided on a “fee for service” basis with only 11% of GTSW income in 2020 being derived from Government Grants. Despite the majority of income being derived from fees, the educational services provided by GTSW is considered to be charitable in nature, being the advancement of education.
In considering the second part, that is, ‘is the property being exclusively used for a charitable purpose’; this criteria is being met by GTSW as they are the sole owner of the property and due to the services that they provide from the property.
It is noted that, in addition to owning the Property in Busselton, GTSW owns and/or occupies five other properties in the City of Bunbury and that the City of Bunbury have granted rate exemptions on each property.
No physical inspection of the Property has been carried out, as its rating classification and the statutory declaration of the Property’s use (contained in the application at Attachment A) is considered to be sufficient.
Statutory Environment
Section 6.26(2)(g) of the Act specifically states that land used exclusively for charitable purposes is not rateable.
Relevant Plans and Policies
There are no relevant plans or policies to consider in relation to this matter.
Financial Implications
If rate exemption is denied, then there may be costs incurred by the City if GTSW was to apply to the State Administrative Tribunal for a review of Council’s decision.
If the rate exemption is granted from 16 December 2020, then Council’s rating income would reduce by $924 for the 2020/21 financial year and approximately $1,993 plus any rate increases for each financial year thereafter.
Stakeholder Consultation
No external stakeholder consultation was required or undertaken in relation to this matter.
Risk Assessment
An assessment of the potential implications of implementing the officer recommendation has been undertaken using the City’s risk management framework, with risks assessed taking into account any controls already in place. No risks of a medium or greater level have been identified.
That being said, if Council choses to not grant rate exemption, then staffing and/or legal costs may be incurred if the applicant refers the matter to the State Administrative Tribunal (SAT) for a review of the decision.
Options
As an alternative to the proposed recommendation, the Council could decline the rate exemption application on the basis that it considers the property to be rateable under the Act. This is not recommended based on the definition of a charitable purpose and risks associated with declining the application as stated above.
CONCLUSION
It is considered that the services provided by GTSW would be defined as an advancement of education and therefore charitable in nature. In these circumstances, 1/18 Trumper Drive, Busselton, is eligible for rate exemption under section 6.26(2)(g) of the Act.
TIMELINE FOR IMPLEMENTATION OF OFFICER RECOMMENDATION
If rate exemption is granted on 1/18 Trumper Drive, Busselton, then it would be applied effective from 16 December 2020, being the date the application was lodged, and implemented within 1 to 2 weeks of Council’s decision.
Finance Committee 102 21 July 2021
Finance Committee 104 21 July 2021
8.1 RATING DEBT RECOVERY
The report listed below is of a confidential nature, in accordance with section 5.23(2) of the Local Government Act 1995. The report has been provided to Councillors, the Chief Executive Officer and Directors only.
RECOMMENDATION That the meeting is closed to members of the public to discuss the following items which are confidential for the reasons as shown. 8.1 RATING DEBT RECOVERY This report contains information of a confidential nature in accordance with Section 5.23(2(b) of the Local Government Act 1995, as it contains information relating to the personal affairs of any person. |